Quotation form for investment project on a cow farm with 500 cows
Ngày đăng: 24-04-2023
391 lượt xem
QUOTATIONS
(About: Prepare consulting and design documents for the project "Cow breeding farm project" with an estimated scale of 500 heads)
To: Valued Customers
Minh Phuong Investment Consultancy and Construction Design Joint Stock Company would like to thank customers for their interest in our services. At your request, the contents of the quotation are as follows:
Sequence number |
Job Description |
Into money (VND) |
1 |
Explanation of investment projects and economic efficiency |
20.000.000 |
2 |
Calculation of total investment |
10.000.000 |
3 |
Design of the overall floor plan |
10.000.000 |
4 |
Correction and printing of records, market surveys |
5.000.000 |
5 |
Meta-analysis of environmental protection measures |
5.000.000 |
6 |
Drafting project approval documents, submissions, travel expenses, surveys, translations ... |
10.000.000 |
|
Total |
60.000.000 |
In words: Sixty million VND |
Sequence number |
Job Description |
Amount |
Into money (VND) |
---|---|---|---|
1 |
Documentation of basic design, overall design |
1 |
250.000.000 |
2 |
Make design documents of construction drawings, drawings of fire protection systems. Travel expenses, lobbying, applying for construction permits ... |
1 |
650.000.000 |
|
TOTAL |
|
900.000.000 |
In words: Nine hundred million. |
- The investor must hire additional geological and topographic survey units to provide data for the design.
Sequence number |
Product Categories |
Execution time (days) |
---|---|---|
1.1 |
Basic design documents |
45 |
1.1.1 |
General narration |
|
1.1.2 |
Drawing components (shown on the background of topographic maps) include: |
|
+ |
Location map and land limits. Shown on a topographic map at the scale of 1/2,000. |
|
+ |
Map of the current state of landscape architecture and assessment of construction land, scale 1/500. |
|
+ |
|
|
+ |
Map of the master plan of land use, scale 1/500. |
|
+ |
Organization diagram of landscape architectural space, scale 1/500. |
|
+ |
The design drawings fully show the required contents stated in Articles 7 and 8 of Circular No. 06/2013/TT-BXD dated May 13, 5, 2013 and Circular No. 16/2013/TT-BXD dated October 16, 2013 of the Ministry of Construction (in appropriate proportions). |
|
+ |
Other technical infrastructure and environmental planning maps, scale 1/500, include:
|
|
+ |
Strategic environmental assessment map; |
|
+ |
General map of technical lines and pipelines. |
|
1.1.3 |
Draft Management Regulations according to detailed planning plans |
|
1.1.4 |
Draft submission and draft decision approving the planning plan |
|
1.1.5 |
The CD contains the entire dossier of the detailed urban planning plan at the scale of 1/500 including explanations, drawings and draft Management Regulations according to the planning plan |
|
1.2 |
Design construction drawings |
45 |
1.3 |
Design drawings of fire protection systems |
45 |
Total estimated time |
135 |
Sequence number |
Job Description |
Into money (VND) |
1 |
Make dossiers for submission for approval of investment policies |
60.000.000 |
2 |
Documentation of basic design, overall design |
250.000.000 |
3 |
Make design documents of construction drawings, drawings of fire protection systems. Travel expenses... |
650.000.000 |
|
TOTAL |
960.000.000 |
In words: Nine hundred and sixty million. |
The above quotation does not include 10% VAT and is valid for 30 days from the date of quotation.
Sincerely thank and look forward to receiving the cooperation from your company!
|
DIRECTOR
NGUYEN VAN THANH |
HOTLINE - 0903 649 782
CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ & THIẾT KẾ XÂY DỰNG MINH PHƯƠNG
Địa chỉ: 28B, Mai Thị Lựu, P. Đa Kao, Quận 1, TP.HCM
Hotline: 0903 649 782 - 028 3514 6426
Email: nguyenthanhmp156@gmail.com
Website: www.minhphuongcorp.com - www.minhphuongcorp.net
Gửi bình luận của bạn