Quotation form for investment project on a cow farm with 500 cows

Quotation form for investment project on a cow farm with 500 cows

Ngày đăng: 24-04-2023

291 lượt xem

Quotation form for investment project on a cow farm with 500 cows

QUOTATIONS

 (About:  Prepare consulting and design documents for the project "Cow breeding farm project" with an estimated scale of 500 heads)

To: Valued Customers

Minh Phuong Investment Consultancy and Construction Design Joint Stock Company would like to thank customers for their interest in our services. At your request, the contents of the quotation are as follows:

1. Make a dossier of submission for approval for approval of investment policies

Sequence number

Job Description

Into money (VND)

1

Explanation of investment projects and economic efficiency

20.000.000

2

Calculation of total investment

10.000.000

3

Design of the overall floor plan

10.000.000

4

Correction and printing of records, market surveys

5.000.000

5

Meta-analysis of environmental protection measures

5.000.000

6

Drafting project approval documents, submissions, travel expenses, surveys, translations ...

10.000.000

 

Total

60.000.000

In words: Sixty million VND

  1.  Note: Quotation does not include 10% VAT.
  2. Handed over products: 08 sets of project explanation documents and soft files related to the project.
  1. Implementation time 20 working days.
    2. Planning design documents

Sequence number

Job Description

Amount

Into money (VND)

1

Documentation of basic design, overall design

1

250.000.000

2

Make design documents of construction drawings, drawings of fire protection systems.

Travel expenses, lobbying, applying for construction permits ...

1

650.000.000

 

TOTAL

 

900.000.000

In words: Nine hundred million.

  1. Notes:
  •  Quotation does not include 10% VAT.

- The investor must hire additional geological and topographic survey units to provide data for the design.

  1.  Implementation time and deliverables:

Sequence number

Product Categories

Execution time (days)

1.1

Basic design documents

45

1.1.1

General narration

1.1.2

Drawing components (shown on the background of topographic maps) include:

+

Location map and land limits. Shown on a topographic map at the scale of 1/2,000.

+

Map of the current state of landscape architecture and assessment of construction land, scale 1/500.

+

  • Map of the current status of technical infrastructure and environmental protection systems, scale 1/500 includes:
  • Current state of the transport system;
  • Current status of ground elevation and surface water drainage;
  • Current status of power supply and lighting systems;
  • Current status of water supply system;
  • Current status of sewage drainage and solid waste treatment systems;
  • Current status of communication systems;
  • Current state of the environment.

+

Map of the master plan of land use, scale 1/500.

+

Organization diagram of landscape architectural space, scale 1/500.

+

The design drawings fully show the required contents stated in Articles 7 and 8 of Circular No. 06/2013/TT-BXD dated May 13, 5, 2013 and Circular No. 16/2013/TT-BXD dated October 16, 2013 of the Ministry of Construction (in appropriate proportions).

+

Other technical infrastructure and environmental planning maps, scale 1/500, include:

  • Ground elevation and surface drainage planning map;
  • Map of power supply and lighting planning;
  • Map of water supply planning;
  • Map of wastewater drainage and solid waste treatment planning;
  • Communication system planning map.

+

Strategic environmental assessment map;

+

General map of technical lines and pipelines.

1.1.3

Draft Management Regulations according to detailed planning plans

1.1.4

Draft submission and draft decision approving the planning plan

1.1.5

The CD contains the entire dossier of the detailed urban planning plan at the scale of 1/500 including explanations, drawings and draft Management Regulations according to the planning plan

1.2

Design construction drawings

45

1.3

Design drawings of fire protection systems

45

Total estimated time

135

  1. Quotation of part (I) and part (II):

Sequence number

Job Description

Into money (VND)

1

Make dossiers for submission for approval of investment policies

60.000.000

2

Documentation of basic design, overall design

250.000.000

3

Make design documents of construction drawings, drawings of fire protection systems.

Travel expenses...

650.000.000

 

TOTAL

960.000.000

In words: Nine hundred and sixty million.

  • Notes:

The above quotation does not include 10% VAT and is valid for 30 days from the date of quotation.

Sincerely thank and look forward to receiving the cooperation from your company!

 

 DIRECTOR

 

 

NGUYEN VAN THANH

HOTLINE - 0903 649 782

CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ & THIẾT KẾ XÂY DỰNG MINH PHƯƠNG

 

Địa chỉ: 28B, Mai Thị Lựu, P. Đa Kao, Quận 1, TP.HCM 

Hotline:  0903 649 782 - 028 3514 6426

Email:  nguyenthanhmp156@gmail.com

Website: www.minhphuongcorp.com

Bình luận (0)

Gửi bình luận của bạn

Captcha

FANPAGE

HOTLINE

HOTLINE:
0903 649 782

 nguyenthanhmp156@gmail.com